A lateral pipeline is like a branch on a tree. It connects a home or business (the leaf) to the main pipeline (the tree trunk).
Our revolutionary new green, no-dig Cured-in-Place Pipelining (CIPP) process for lateral pipelines, cleans the existing lateral connection, measures it for a new, custom-made replacement liner and installs the new lining system all from within the existing access points (manholes) of the main pipeline connection.
Access to homes or businesses in not necessary while repair work is underway and there is no need to dig a traditional clean-out on the property.
Our state-of-the-art CIPP process meets new pipe standards and durability (50-100 years) and repair cost, time and disruption is significantly reduced.
Why Dig?







