Large Diameter Pipelining

Our unique green, no-dig Cured-in-Place Pipelining (CIPP) and Glass Reinforced Plastics (GRP) lining process equals new pipe standards for reliability and durability, and repair cost, time and disruption is significantly reduced.

Studies have shown upwards of 80% cost-savings and a 90% decrease in green house gas (GHG) emissions as a direct result of the use of no-dig pipeline rehabilitation, in comparison to the traditional dig-and-replace method of pipeline repair.

Read more about the CIPP and GRP process and how they are applied to large diameter pipeline repairs.

Why Dig?