Cured-in-Place Pipelining

Our unique green, no-dig Cured-in-Place Pipelining (CIPP) process relines pipelines with a continuous liner from access-point to access-point (manhole to manhole) or in sections (point repairs).

This process involves the inversion of a resin saturated felt liner into the existing pipeline. The inverted liner is heat-cured and the end result is a new, continuous pipeline inside the original host pipe. The resin is specially formulated for each pipeline application and the liner is custom-made to the exact pipeline diameter being repaired.

Our state-of-the-art CIPP process meets new pipe standards and durability (50-100 years) and repair cost, time and disruption is significantly reduced.

Why Dig?