Homeowner – Waterford, Michigan, USA

What Others Say About

I really appreciate the excellent level of service I was given…

Homeowner, Bamford Drive
Township of Waterford, Michigan, USA
07 May 2007

January 18th, 2012|

Genesee County Drain Commissioner, Flint, Michigan, USA

 

What Others Say About

The Division of Water and Waste Services has awarded contracts to LiquiForce Sewer Services over the past several years for numerous sewer main repairs…

The Division of Water and Waste Services was extremely satisfied with the timeliness, professionalism and integrity in which the projects were completed.

Jeffery Wright,
Genesee County Drain Commissioner
Flint, Michigan, USA
07 December 2007

January 18th, 2012|

Charter Township of Waterford, Michigan, USA

What Others Say About

Over the past four (4) years LiquiForce Services has successfully preformed substantial sewer rehabilitation work…your firm also successfully serves as contractor of record for sewer rehabilitation services to the Township…

…To say the least, the Township has not been disappointed in your performance to date. As a result, we have and do, strongly recommend your firm to other communities seeking to have such work completed.

Terry E. Biederman, P. E.
Director of Public Works Services
Township of Waterford, Michigan, USA
20 December 2007

January 18th, 2012|

Charter Township of Grand Blanc, Michigan, USA

What Others Say About

I would like to express my satisfaction in all aspects of the quality work performed by LiquiForce with Grand Blanc Township . . . all of your work within the Township has been performed to a very high level of quality and has contributed to the prolonged life of our sanitary sewer system . . .

. . . I am very pleased to have the LiquiForce team performing work in this community . . .

Jeff Zittel, Supervisor
Grand Blanc Township, Michigan, USA
23 August 2004

January 18th, 2012|

City of Bay City, Michigan, USA

What Others Say About

I believe that the services provided to the City of Bay City by the management and employees of the LiquiForce organization were above and beyond the level of service provided by any other contractor working for the City of Bay City.

John H. Kolessar, PE
Director of Engineering and Public Infrastructure
(Past President of the American Public Works Association, Michigan Chapter)
Bay City, Michigan, USA
20 August 2004

January 18th, 2012|

City of Southfield, Michigan, USA

What Others Say About

I would like to express my satisfaction in all aspects of the quality work performed by LiquiForce with the City of Southfield…

It has been my experience that all of your work throughout the City has been performed to a very high level of quality and has contributed to the prolonged life of our sanitary sewer system.

Gary M. Mekjian, P.E.
Director of Public Works
City of Southfield, Michigan, USA
18 December, 2007

January 18th, 2012|

City of London, Ontario, Canada

What Others Say About

Project: Trunk Sewer Section Rehabilitation
Location: London, Ontario, Canada

This letter is to express our continued excellent experiences in working with LiquiForce Services on sewer renewal projects. Our most recent project was the relining of a section of trunk sewer that was severely corroded by hydrogen sulphide.

LiquiForce responded to a Request for Proposal, and submitted an exceptional proposal that earned the highest technical points out of all submissions. The solution presented in their proposal worked well outside the box to minimize disruption to residents and shorten their time on site….

We would not hesitate to work with LiquiForce Services on future projects, it is a pleasure to work with them. They work hard to meet and exceed expectations, and truly care about delivering a high quality product and excellent customer service. I have no reservations in recommending their services….

Ashley M. Rammeloo, P. Eng.
Environmental Services Engineer
Wastewater & Drainage Engineering
The Corporation of the City of London
02 February 2010

January 8th, 2012|

City of Waterloo, Ontario, Canada

What Others Say About

Project: Major Trunk Sewer Rehabilitation — Environmentally Sensitive Area
Location: Waterloo, Ontario, Canada

The City undertook the rehabilitation of a 900mm and larger trunk server main through an environmentally sensitive area of the City. The project entailed the by-passing, cleaning and rehabilitation on one of the major trunk mains in the City adjacent to the treatment plant.

LiquiForce worked closely with City Staff to minimize disruptions and noise to City residents in this park area. In all cases, the staff of LiquiForce conducted themselves in a very professional and courteous manner. Their dedication to the project ensured success.

We would not hesitate to utilize LiquiForce Services for future projects and recommend them for sewer infrastructure rehabilitation projects….

Tim Anderson, P. Eng.
General Manager of Public Works Services
City of Waterloo
10 September 2006

January 8th, 2012|

Homeowner – London, Ontario, Canada

What Others Say About

 


Project: Gordon Avenue Sewer Rehabilitation
Location: London, Ontario, Canada

We are writing to commend your company for their efficiency and professionalism. While there were trucks and equipment lining the street, including in front of our house, we were able to access the street and our driveway. When it was done, everything was put back in place and any debris was cleaned from the property. The work in front (of) our house was completed on schedule.

We felt that any concerns we had about the situation were handled quickly with courtesy and positive action.

Thank you for making what could have been a very disruptive occurrence as tolerable as possible.

Homeowner, Gordon Avenue
London, Ontario, Canada
13 January 2010

January 8th, 2012|

City of London, Ontario, Canada

What Others Say About

Project: Balfour Sanitary Sub Trunk Rehabilitation
Location: London, Ontario, Canada

This letter is in regards to our recent experience with LiquiForce Services Incorporated on the “Balfour Sanitary Sub Trunk Rehabilitation Project”. The project was the rehabilitation of a 52 year old concrete sewer that was in “poor” to “failed” condition. A trenchless solution was desired because this sewer runs through a ravine….

LiquiForce scored the highest number of technical points for their proposal and also had the lowest cost. Once the project was underway LiquiForce staff displayed professionalism and courteousness at all times. As with most projects, unexpected issues arose. These were always handled immediately and to the full satisfaction of the City.

We would not hesitate to work with LiquiForce Services on future projects, it was a pleasure to work with them. They work hard to meet and exceed expectations, and truly care about delivering a high quality product and excellent customer service. I have no reservations in recommending their services….

Ashley M. Rammeloo, P. Eng.
Environmental Services Engineer
Wastewater & Drainage Engineering
The Corporation of the City of London
06 August 2009

January 8th, 2012|